Introduction. The process of innovative development of the road industry for the period 2012-2017 is analyzed in the article. It is proclaimed that for the development and arrangement of Russian roads during 6 years would be invested more than 11 trillion rubles in comparison with 6.4 trillion in 2012-2017. Thus, the significant increase in funding would lead to the fundamental change in the approaches to the planning of the innovation process.
Materials and methods. The main shortcomings in the development of the innovative strategies in industry were demonstrated. The problem that the strategies have no interrelations between the goal, resources and time is formulated. All production systems operate in different conditions and are characterized by different levels of the resources consumption and, consequently, by different efficiency. At the same time, it is very difficult to formulate a goal in the absence of sufficiently accurate predicted performance parameters of production systems.
Results. As a result, it is difficult to determine the effectiveness of the funds allocated for innovative development.
Discussion and conclusion. Digitalization in the form of the production function is an effective management tool to improve the validity and effectiveness of the innovative development strategy in the road sector, to carry out current calculations monitoring and evaluation of the desired parameters accuracy.
About the Authors
A. V. BorovikRussian Federation
Borovik Аnastasia Vital’evna – student
Volgograd
A. S. Sedova
Russian Federation
Sedova Anastasia Sergeevna – candidate of technical science, Associate Professor of the Construction and Transport Facilities Operation Department
Volgograd
References
1. Bystrov N.V. Novyy etap razvitiya normativnoy bazy na dorozhnyy asfaltobeton [New stage in the development of the regulatory framework of the road asphalt concrete]. Nauka I tekhnika v dorozhnoy otrasli, 2017, no 2, pp. 2-6. (In Russian)
2. Borovik V.S. Modernizatsiya dorozhno-stroitelnogo proizvodstva [Modernization of the road construction industry]. LAP LAMBERT Academic Publishing GmbH & Co.KG. Saarbrücken 2011. 292 str. (In Russian)
3. Ostrovskaya G.N. Prognozirovaniye obyema vypolnyayemykh rabot pri operativnom upravlenii dorozhnym predpriyatiyem naosnove vybora prioritetnogo napravleniya proizvodstvennoy deyatelnosti [Forecasting the work volume performed in the operational management of the road company based on the choice of the priority direction of production activities]. Dis. kand. tekhn. nauk. Volgograd. VolgGASU. 2004. 151 p. (In Russian)
4. Sedova A.S., Borovik V.S., Prokopenko Yu.E. Rol vremeni priprognozirovanii rezultatov deyatelnosti predpriyatiya v usloviyakh innovatsionnogo razvitiya [Role of time in forecasting the performance of the enterprise in terms of the innovative development]. Izvestiya Vuzov. Stroitelstvo, 2008, no. 11-12, pp.89-93. (In Russian)
5. Borovik V.S., Borovik V.V. Analysis of the time role in the production process in 4D space// EasternEuropean Journal of Enterprise Technologies. / №6/10(84).2016 PP 41-48 (Scopus) DOI: 10.15587/1729-4061.2016.86535.
6. Borovik V.S., Borovik V.V., Prokopenko Yu.E. Model upravleniya vnedreniyem novoy tekhnologii na osnove proizvodstvennoy funktsii [Model for managing the implementation of the new technology based on the production function]. Ekonomicheskiyanaliz: teoriyaipraktika, 2013, no 42 (345), pp.25-30. (In Russian)
7. Michael J. Clay. Uncertainty analysis of the large zone economic module of the simple. efficient. elegant. and effective model (SE 3 M) of land use and transportation. Transportation Planning and Technology. Aug 2017. P 23.
8. Yarmolinskiy V.A. Kamenchukov A.V. Puti povysheniya nadezhnosti raboty avtomobilnykh dorog Dalnego Vostoka [Ways to improve the reliability of the roads of the Far East]. Nauka I tekhnika v dorozhnom stroitelstve, 2017, no 3, pp.14-17. (In Russian)
9. Gaikwad P. G. Prashant P. Nagrale. NileshPatil. (2016) Analysis of Time and Cost Overruns in Road Project // Journal of Construction Engineering. Technology & Management. V 6. № 2 (2016) pp. 42-51.
10. Bobrova T.V. Dubenkov A.A. Obosnovaniye konstruktivnykh resheniy zemlyanogo polotna nauchastkakh avtomobilnykh dorog v usloviya khkriolitozony [Substantiation of structural solutions of the road base on the sections of highways in the conditions of cryolithozone]. VestnikSibADI, 2015, no 4, pp. 57-64. (In Russian)
11. Silianov V.V. Puti povysheniya effektivnosti upravleniya dorozhnym dvizheniyem v megapolisakh [Ways to improve the efficiency of traffic management in metropolis]. Nauka I tekhnika v dorozhnoy otrasli,2013, no 3. pp. 1-4. (In Russian)
12. Pisano G.P. You Need an Innovation Strategy. Harvard Business Review. From the June 2015 Issue. https://hbr.org/2015/06/youneed-an-innovation-strategy Data obrashcheniya 01.01.2018.
13. Solodkiy A.I. Razvitiye intellektualnykh transportnykh sistem v Rossii – problem I puti ikh resheniya [Development of intelligent transport systems in Russia problems and solutions]. Nauka I tekhnika v dorozhnoy otrasli, 2017, no 1. pp.18-20. (In Russian)
14. Bessonov V.A. Problemy postroyeniya proizvodstvennykh funktsiy v rossiyskoy perekhodnoy ekonomike. Str. 39. 73. [Problems of building production functions in Russian transition economy]. Available at: http://www.economicus.ru/macroeconomica/readings/Prois_funk.pdf. (Assessed at 11.01. 2018). (In Russian)
15. Minaker P.A., Mashtaler T.N., Prokopenko O.M. Predplanovoye issledovaniye faktorov regionalnogo ekonomicheskogo rosta [Preplanning study of factors of regional economic growth]. Izv. AN SSSR. Sib. otdeleniye. Ser. obshch. nauk. 1982, no.1, no 1. (In Russian)
Review
For citations:
Borovik A.V., Sedova A.S. INNOVATIVE ACTIVITY IN THE ROAD SECTOR AND THE STRATEGY FOR THE DEVELOPMENT OF SUCH ACTIVITY. The Russian Automobile and Highway Industry Journal. 2018;15(4):548-559. (In Russ.) https://doi.org/10.26518/2071-7296-2018-4-548-559