Introduction: the main feature of operation of cranes-pipe layers is work in difficult ground conditions, which significantly affects the operating mode of the machine. This factor is one of the main reason leading to the rocking of the load on the crane-pipe laying machine gibbet and as a consequence it leads to emergency and contingency situations. In the research the forced vibration of the load on the crane-pipe layer gibbet and the causes of their occurrence and the problems to which they lead are observed. Engineering solutions of predecessors are considered. A new approach to the solution of these problems is proved.
Materials and methods: the design scheme of the crane-pipe laying machine is justified, assumptions are accepted, coordinate systems are introduced, and a mathematical model of the crane-pipe-laying machine is compiled.
Results: the following time dependences are constructed: the deflection of the cargo in the transverse plane of the crane-pipe layer (horizontalvibrations), the deflection of the cargo in the longitudinal plane of the pipe laying crane, the roll of the base machine, the change in the load moment are also constructed. The influence of the horizontal vibrations of the load on the change in the load moment and the occurrence of vertical vibrations is determined.
Discussion and conclusion: the effect of horizontal vibrations on the change of the load moment is evaluated and as a consequence of the negative effect on the stability of the crane-pipe laying machine is presented.
About the Authors
R. Yu. SukharevRussian Federation
Ph.D., Associate Professor, Department 2APPiE», Associate Professor
644080, Omsk, Mira Ave., 5
V. V. Tanskiy
Russian Federation
Department «Mechanics», engineer
644080, Omsk, Mira Ave., 5
References
1. Sherbakov V.S., Koritov M.S., Kotkin S.V. Sistema avtomatizatsii modelirovaniya strelovykh gruzopod»yemnykh kranov [The automation system simulation jib cranes]. Omsk, SibADI, 2012, 143 p.
2. Sherbakov V.S., Koritov M.S., Shabalin A. N. Metody upravleniya komplektom mashin truboukladochnoy kolonny [A set of management practices of the column pipe- laying machines]. Omsk, SibADI, 2014, 151 p.
3. Sherbakov V.S., Sukharev R.Y. Sovershenstvovaniye sistemy upravleniya rabochim organom tsepnogo transheynogo ekskavatora [Improving governance working body of the chain trencher]. Omsk, SibADI, 2011, 149 p.
4. Tanskiy V.V. Vliyaniye koordinat tochki krepleniya uravnoveshivayushchego kanata na kolebaniya gruza krana - truboukladchika [Effect reference point mount counterbalancing ropes wavering cargo pipe-laying crane]. Vestnik Sibadi, 2017, no 1(53), pp. 48-53.
5. Sherbakov V.S., Koritov M.S., Postukhova E.I. Avtomatizatsiya protsessa modelirovaniya trayektorii dvizheniya rabochego organa robota manipulyatora [Automation simulation trajectory of the working body of the robot manipulator]. Omsk, SibADI, 2009, 120 p.
6. Gorbatikov V.A. Proyektirovaniye obustroystva neftyanykh mestorozhdeniy i yego nauchnoye obosnovaniye [Designing the arrangement of oil fields and its scientific justification]. Neftyanoye khozyaystvo - Oil Industry, 2005, no 9, pp. 114 - 119.
7. Minkin M.A., Potapov O.A. Osobennosti obustrojstva neftjanyh i gazovyh mestorozhdenij Rossii i osnovanija i fundamenty zdanij i sooruzhenij [Features of the arrangement of oil and gas fields in Russia and the foundations and foundations of buildings and structures]. Vestnik Moskovskogo gosudarstvennogo stroitel’nogo universiteta - Bulletin of the Moscow State University of Civil Engineering, 2006, no 1, pp. 180 - 187.
8. Popov M.Y., Osipov S.P. Osobennosti ekspluatatsii strelovykh kranov i kranov- truboukladchikov v rezhime peremeshcheniya s gruzom v usloviyakh promyslovogo bezdorozh’ya [Features of operation of jib cranes and pipelaying cranes in the mode of moving with cargo in off-road fishing conditions]. Mekhanizatsiya stroitel’stva - Mechanization of construction, 2013, no №11(833), pp. 22 - 25.
9. Shabalin A. N. Sistema upravleniya kranom - truboukladchikom isklyuchayushchaya oprokidyvaniye truboukladochnoy kolonny [The control system of the crane - the pipe laying device, which excludes the overturning of the pipe-laying column]. Materialy VII Vserossiyskoy nauchnoprakticheskoy konferentsii FGBOU VPO «SibADI» «Razvitiye dorozhno-transportnogo kompleksa i stroitel’noy infrastruktury na osnove ratsional’nogo prirodopol’zovaniya» [Materials of the VII All-Russian Scientific and Practical Conference «SibADI» «The development of the road transport complex and the construction infrastructure on the basis of rational nature management»], 2012. pp. 83 - 87.
10. Semin E.L. Kapital’nyy remont magistral’nykh truboprovodov s primeneniyem gruntovykh i inventarnykh opor [Overhaul of main pipelines using ground and inventory supports. Pipeline transport: theory and practice]. Truboprovodnyy transport: teoriya i praktika - Pipeline transport: theory and practice, 2011, no №4(26), pp. 25 - 27.
11. Sherbakov V.S., Milyshenko S.A. Sovershenstvovaniye sistemy upravleniya vyglazhivayushchey plitoy asfal’toukladchika [Improving governance screed paver]. Omsk, SibADI, 2010. 161 p.
12. Sherbakov V.S., Koritov M.S., Grigorev M.G. Avtomatizatsiya proyektirovaniya ustroystv upravleniya polozheniyem platformy stroitel’noy mashiny [Design automation controls the position of a construction machine platform] Omsk, SibADI, 2011, 119 p.
13. Sherbakov V.S., Koritov M.S., Arkhipenko M.Y., Kamuz N.A. Stabilizatsiya nesushchey platformy v gorizontal’noy ploskosti [Stabilization of the support base horizontally]. Stroitel’nyye i dorozhnyye mashiny - Building and road machines, 2013, no 2, pp. 36 - 40.
14. Sherbakov V.S., Koritov M.S., Kamuz N.A. Metodika proverki polozheniya gruzopod»yemnogo krana v prostranstve konfiguratsiy po ogranicheniyu na ustoychivost’ [Methods of checking the position of the crane in the configuration space to limit the stability]. Materialy 66-y Mezhdunar. nauch.-prakt. konf. «Oriyentirovannyye fundamental’nyye i prikladnyye issledovaniya - osnova modernizatsii i innovatsionnogo razvitiya arkhitekturno-stroitel’nogo i dorozhno- transportnogo kompleksov Rossii» [Materials of the 66th Intern. scientificpractical. Conf. «Oriented fundamental and applied research is the basis for modernization and innovative development of the architectural, construction and road transport complexes of Russia»], 2012, no 66, pp. 408 - 412.
15. Sherbakov V.S., Shabalin A. N. Kran - truboukladchik [Pipe-laying crane]. Patent RF, no 2013115403/11, 2013.
16. Sherbakov V.S., Shabalin A. N. Kran - truboukladchik [Pipe-laying crane]. Patent RF, no 2013155099/11, 2013.
17. Sherbakov V.S., Koritov M.S., Tanskiy V.V. Kran - truboukladchik [Pipe-laying crane]. Patent RF, no 2015120191/11, 2015.
18. Sherbakov V.S., Tanskiy V.V. Kran - truboukladchik [Pipe-laying crane]. Patent RF, no 2015120193/11, 2015.
19. Shabalin A. N. Sistema stabilizatsii nagruzki na kran - truboukladchik [The system for stabilizing the load on the pipe - laying crane] Vestnik Sibadi, 2013, no 2 (30), pp. 29 - 34.
20. Tanskiy V. V. Obosnovaniye raschetnoy skhemy krana-truboukladchika [Justification of the design scheme of the pipe-laying crane] Tekhnika i tekhnologii stroitel’stva, 2017, no 4 (8), pp. 54 - 60.
Review
For citations:
Sukharev R.Yu., Tanskiy V.V. THE INFLUENCE OF THE HORIZONTAL LOAD VIBRATIONS OF THE CRANE-PIPE LAYING MACHINE GIBBET ON THE LOAD MOMENT STABILITY. The Russian Automobile and Highway Industry Journal. 2017;(6(58)):17-22. (In Russ.) https://doi.org/10.26518/2071-7296-2017-6(58)-17-22
ISSN 2658-5626 (Online)